4th

30cubic Metre Concrete Elevated Tank
Constructed at Sankhone

3rd'

Concrete Elevated Tower with PVC Tanks at Sarefuta

2nd

Air Lifting at NAWEC SS5 borehole

img (10)

Ongoing construction work on elevated concrete tank at Mankamang kunda

image
image
image
image

Ongoing construction work at Duta bulu

261

Dr Frederic Keller Bauer inspecting completed works at Duta Bulu

image
image
image

Borehole materials

247

Water meter installed at Duta Bulu water supply system

img (4)

Back pooling of drilling pipes at Kwonkuba (FAO Project site)

473

 Edith cutting ribbon during the inauguration ceremony at Juman Sarba

579

Ground water technician taking records during pumping test

img (8)

Borehole drilling works in Southern Senegal, Cassamance

photo 18 chinese team

 Chinese team conducting Geo physical measurement

photo 20 handing over of water facility

Handing over of water facility by San De Gel to the community of Kunun Numu Kunda

img (3)

Community Prayers before the commencement of drill works at Kunun Numu Kunda

watertech-1

Concrete Elevated Tower with PVC Tanks

watertech-2

 Surprise visit by his excellenacy the president of The Gambia, Adama Barrow at the project site in Mankamang Kunda

watertech-3

 Mini water supply system newly installed at Mankamang Kunda newly build police station

watertech-4

Videos